Case Study · Public administration

Charging infrastructure for the electric fleet of the Donau-Ries District Office

The Donau-Ries District Office wanted to switch its fleet to electric vehicles. We gathered the requirements, researched the market, searched for a suitable provider and advised the district office. The provider then took care of installation and testing.

12charging points with dynamic load management
Client
Donau-Ries District Office (Landratsamt Donau-Ries)
Industry
Public administration
Our role
Requirements, research, provider search and consulting
Period
03/2021 – 04/2021
Charging infrastructure for the electric fleet of the Donau-Ries District Office
Schematic illustration

Situation and challenge

The district office wanted to create charging points for its official vehicles – with the further growth of the electric fleet already in mind. The market is confusing: many manufacturers, software providers and protocols, plus the risk of being locked into one system. And an existing grid connection is often not enough when several vehicles charge at the same time: without load management, expensive load peaks or an upgrade of the connection are likely.

Solution and approach

  • Requirements gathered: number of charging points, location, access and later expansion stages
  • Research into charging stations and charging and energy management, with a focus on vendor neutrality through open standards such as OCPP
  • Provider search: suitable providers found, quotes obtained and options for 12 charging points compared – one-off and running costs
  • Advice on load management: static or dynamic – the dynamic approach takes the building load into account and makes the best use of the existing grid connection
  • Guidance on calibration law and billing, for example if private vehicles are to charge as well

Result

  • Clear requirements and a sound basis for decisions with one-off and running costs
  • A suitable provider found, who took care of installation, commissioning and testing
  • Load management instead of expensive load peaks or a grid upgrade
  • An open, vendor-neutral solution that can grow with the electric fleet

Built with

AC-Ladestationen (22 kW)Dynamisches LastmanagementLade- und EnergiemanagementOCPPRFID

Related services

Stefan Ackermann

Discuss a similar project

Tell us about your situation – in a free initial call we'll work out what a solution could look like for you.

An error has occurred. Reload

Reconnecting …

Reconnection failed – retrying in seconds.

The connection could not be restored.
Please reload the page.

The session has been paused.

The session could not be resumed.
Please reload the page.